Case studies

One build, written up with its site conditions

A case study here means the whole job: the size, the schedule and the ground the pool had to sit on. Right now there is one, a modern pool in Greenwich that was poured while the house was still going up around it.

Pool built above grade behind a glass rail beside a modern house
Greenwich, CT
Suburban Paradise
A 20 x 50 foot gunite pool with a built-in spa, a tanning ledge and an autocover hidden in the deck, set above grade within an elevated patio.
Place
Greenwich, CT
Pool
Modern 20 x 50 foot gunite rectangle
Built in
Spa, tanning ledge, autocover hidden in the deck
Schedule
Ground broken December 2021, completed September 2022
Site
Above grade, inside an elevated patio

This is the only project written up in full so far. More finished pools, sorted by shape, are in the portfolio. If you are weighing a build of your own, the shell behind every one of them is described in new pool construction, and the spillovers, ledges and sheer descents are on the water features page. To talk through your own site, get in touch.

Tuesday to Friday, 9 to 4

Start with a meeting at 153 Dewey Street

Bring a survey or a photo of the yard. The first meeting covers the design, a working budget and what your town will ask for.

Call

(203) 433-6808

Tue-Fri 9am-4pm

info@aapool.com